homearchitecturegeneral projectsgeneral project 3

general project 3


CDP 7520 – Sines Postal Distribution Centre, CDP Project, for the industrial batch 11441 of ZIL -2 (Sines Industrial Zone). Some proposals incorporating prefabricated metal frame and reinforced concrete solutions,were prepared. This was the option taken, given the proximity sea. This  CDP was designed to support the postal distribution of parcels, with the introduction of a top costumers lounge and a loading/ unloading  support area tied to the clients service. The central space includes handling areas and the rear areas are for social and technical support.

reserved area